[Construction Case] Slab Foundation House: Settlement Correction Work (Kyoto Prefecture)
Corrected a maximum settlement of 46mm! A case that resolved the distortion of the door frame caused by settlement.
Here is an example of "settlement correction work" performed on a slab foundation house located in Kyoto Prefecture. This case involves a house that sank due to ground subsidence, resulting in warped door frames and gaps. The slab foundation house, which experienced a maximum settlement of 46mm, was corrected in 2.5 days. 【Case Overview】 ■ Maximum Settlement: 46mm ■ Area: Kyoto Prefecture ■ Construction Period: 2.5 days *For more details, please refer to the PDF document or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other